Anaheim ESD - 2026-06-FAC-GC
Gauer Playground and Shade
Bid Results
(click to expand/collapse)

Name | Size | ||
1. ACC and Engineering | 11.4 MB | ||
2. EBSA Construction | 8.0 MB | ||
3. Co Brothers | 8.7 MB | ||
4. Micon Construction | 12.0 MB | ||
5. JMJ Construction | 9.5 MB | ||
6. Socoast Contracting | 9.8 MB | ||
7. Elegant Construction Inc | 10.7 MB | ||
8. Edra Construction Corporation | 9.2 MB | ||
9. GDL Best Construction | 9.5 MB | ||
10. Golden Gate Construction | 14.2 MB | ||
2026-06-FAC-GC Bid Opening Sign-In Sheet | 320.1 KB | ||
2026-06-FAC-GC Bid Tab Sheet | 10.8 KB |
Bid Specs
(click to expand/collapse)

Name | Size | ||
2026-06-FAC-GC Gauer Playground and Shade | 21.5 MB |
Job Walk Documents
(click to expand/collapse)

Name | Size | ||
2026-06-FAC-GC Job walk agenda | 596.9 KB | ||
2026-06-FAC-GC Job walk sign in sheet | 2.5 MB |
Planholders
(click to expand/collapse)

Name | Size | ||
2026-06-FAC-GC PLANHOLDERS LIST | 78.2 KB |